| XIAOJIN 的个人资料Life in LA, love in life...照片日志列表 | 帮助 |
|
2006/4/27 Some of ASLA 2006 Professional Awards
Narrative Summary: In July 2002, Taizhou City asked the landscape architect to design a 21-hectare park along the Yongning River, the mother river of the historical city at the east coast of China. At that time, most of the park site along the riverside was already embanked with concrete as part of the local flood control policy. In meeting the needs of designing this park, the landscape architect had to provide a concept that would be accessible to both tourists and locals, while also providing an alternative flood control and storm water management solution to be used as a model for the entire river valley. The result was the Floating Gardens. 1.The challenges that faced the landscape architect were: (2) To design an alternative flood control and storm water management solution, which would be used as a model for the entire river valley management. As a part of the speedy urbanization process in China, almost all rivers in China are finding the same fate; single-minded flood control projects based on concrete engineering and damming are canalizing their banks. Vis-à-vis this prevailing trend, this design would become a model not only for the Yongning River, but also a visible model for all the river treatment and flood control projects in China. (3) To design a functioning park, which unlike a natural bird sanctuary which can flood and serve wildlife, must also be accessible and serve tourists and locals. 2.The design solutions: The Floating Gardens The park is composed of two layers: the natural matrix overlapped with the human matrix---- the floating gardens. The natural matrix is composed of wetland and natural vegetation designed for the natural processes of flooding and native habitats. Above this natural matrix, float the gardens of humanity composed of a designed tree matrix, a path network, and a matrix of story boxes. The design draws on the following aspects: (2) An alternative flood control solution: a wetland system, based on the regional flood security pattern analysis enabled flood control and water management to become an integral part of the park design. The whole site along the river becomes a multi-functional project under the leadership of the landscape architect. (3) The matrix layer for the natural processes: composed of a restored riparian wetland along the flood plain and an outer wetland (lake) outside of the river bank that runs parallel to the river, the entirety of the park is covered with native communities. During the monsoon season, both the riparian wetland and the outside wetland are flooded. During the dry season, the outer wetland will still be submerged from both the retained water and fresh water from the inlet located in the upper reach of the river. Year round, water is accessible to park users. (4) Native wetland plants, trees and bamboos are massed along the riverbank and throughout the design not only to ensure successful establishment of the vegetation, but also to promote continuity of the design with the surrounding ecosystem. (5) The upper layer for the humanity which "floats" above the seasonally flooded natural matrix, is composed of groves of native trees, a network of paths extends from the urban fabric downwards the park, while a matrix of story boxes which allude to the culture and history of the native land and people punctuate the landscape at strategically placed points, among them are a box of rice, a box of fish, a box of hardware crafts, a box of Taoism, a box of stone, a box of mountain and water, a box of citrus and a box of martial arts. The use of boxes is a design approach to frame a human scale scene for a special theme within a large landscape background. 3.The significance of the park The Floating Gardens is a park that incorporated minimum design techniques to create an accessible and interesting landscape dominated by nature.
Lite-On, a major Taiwanese electronics company, chose the site for their new corporate headquarters with the "Electronics Center" of Taipei overlooking the Gee Long River. The owner retained the Architect and Landscape Architect to work together to achieve three key objectives:
The overall concept was a 25-story slender tower rising above a sloped landscape podium that covered much of the site. The podium built over four levels of below grade parking sloped toward the river on one side and toward the urban center on the other side. This configuration maximizes views from the tower and for users of the landscape gardens. The podium provided security, view gardens and a green roof, retaining storm water, storing it for irrigation, and providing insulation for the public spaces below. The podium at the rear of the site slopes one story to the street where a major vehicular entry provides access into the recessed atrium court. The larger podium on the riverside slopes two stories down to the boulevard. A second vehicular drop off is on this podium at the front building face. As the garden slopes away from the tower stepped water features create visual and audio interest. The landscape features take into account the limitations on the soil depth, weight, etc., imposed by the structures below. The view corridor of the long sloped podium is emphasized by linear planting beds, lawn panels, and granite walkways. Garden spaces are created to allow for informal seating and outdoor gatherings. Halfway down the garden, a light well opens to a courtyard below that is viewed from the cafeteria at the lower level. Stepped fountains in the courtyard and a grove of Madagascar almond (Terminalia mantaly) can be viewed from the cafeteria or from the pedestrian bridges on the podium above. The two podium gardens are flanked on the street below by orchards of Camphor trees and Golden Rain trees also serving as street trees. The generous open space around the tower gives it distinction in a dense urban context, as well as playing a major role in accomplishing the vision of the owner as a total "green" development. Conceived before LEED accreditation, this was the first green roof envisioned and built by a private party in Taipei.
The Providence 2020 Plan links the valley to the bay along an arc of public waterfront parks and a spine of transit. The new definition of downtown encompasses 1200-acres along this crescent, embracing the traditional downtown as well as adjacent industrial districts. Building on unique characteristics of topography, access, and architecture, each district will be positioned slightly differently to attract investment and economic development, ultimately offering a variety of experiences. Waterfront landings in each district will welcome residents and other visitors into the continuous waterfront park system. A network of new streets will repair areas rent by infrastructure and will regenerate industrial zones. These pedestrian friendly streets will extend up to the neighborhoods on the surrounding hills, joining them to the life of downtown.
Part of the city's distinct charm is the variety of places that have grown up along the river valley and the bay: the Promenade District, Capital Center, Downcity, Jewelry District, and the Narragansett Bayfront. Different architecture, activities, and tradition make each area stand on its own merits. Opportunities for infill development, adaptive reuse, and new streets and parks are vast, suggesting that each district could host both residential and commercial uses as well as supporting retail and civic uses. The concept of 18-hour mixed-use districts with places to live and work in close proximity to the arts as well as services encourages a committed downtown residential community. The continuous waterfront greenway will weave through each downtown district, punctuated by a series of distinctive park landings for the neighborhoods. While Providence has made great strides on its continuous waterfront parks, these efforts need to extend upriver to the Woonasquatucket River and down to the Bayfront. The distribution of new waterfront parks will make every neighborhood and every resident welcome to the larger recreational system. Walkable streets, for which Providence is already well known, will extend into the former industrial districts to create more permeable access and real estate frontage. The relocation of Interstate 195 offers the opportunity to create a seamless pattern of new streets, parks, and development blocks with an emphasis on connections down to the water's edge. A transit spine will connect the head of the valley to the bayfront, following along the length of the waterfront. The concept for the transit line can evolve over time, beginning with a rubber-wheel trolley, expanding into bus rapid transit, and if driven by demand, eventually being replaced by light rail transit. Transit stops will be spaced about one half mile apart to collect a five minute walk zone. At a few key locations, intermodal centers will interface with regional bus service, the existing trolley system, and automobile commuters using nearby structured parking. Looking to the future, the character of each district should be celebrated to underscore different strengths. In this way the districts will complement one another and lessen the threat to the traditional core of downtown. This approach will build a city with a variety of choices for living, many different destinations for visiting, and investment decisions based on physical and economic competitive advantages. Process and Implementation Strategy As the team synthesized the key issues and developed design concepts and planning strategies for implementation, these ideas were discussed with the community leaders and with the broader public. A series of events held in May and June 2005 combined open houses and public forums. The dialogue from these meetings shaped the urban design and planning recommendations of the Providence 2020 plan. Through a close working relationship with many of the community leaders, the plan was able to identify the appropriate roles and responsibilities for implementation. The implementation strategy focuses on phasing and the designation of roles and responsibilities of the different involved entities. Unlike previous plans, the Providence 2020 plan addresses the greater downtown and prioritizes public investment across this broader area. In this way, the public and the private sector can target development to the appropriate district within the context of a schedule for improvements over a 15 year period. Phasing plans allow the involved stakeholders to focus their efforts, and direct capital budgets and fundraising for the immediate projects. The strength of the plan, however, is its flexibility to accommodate opportunity-driven projects and unforeseen situations within an overall development framework. Summary 引用通告此日志的引用通告 URL 是: http://landymark.spaces.live.com/blog/cns!43553B73E0B6488D!291.trak 引用此项的网络日志
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|